Installation Guidelines for the Gardener Unit
Step 1: Prepare the site

►
Dig a trench the full length and width of the wall you want to
construct. The depth of the trench should be slightly more than the height
of one unit.
► Place
leveling pad, consisting of a 2 to 3-inch layer of crushed stone or
gravel, over compacted soil.
Step 2: Set the base course

►
Once the leveling pad is complete, install the first layer of units. For
correct alignment, use a string line along the back to make sure they are
flush. Use a level to ensure the units are uniform front-to-back and
side-to-side.
► After
the base course is level and in place, use the soil created from digging
the trench to backfill the void behind the units. It is important to
tightly compact the soil to ensure a soil base for the rest of the
courses.
Step 3: Stack additional courses
► Before
placing the second course of units onto the base, make sure the top of the
first layer of units has been cleaned and is free of debris.
► Place
the next course onto the existing layer backfill with dirt and compact.
►
Repeat, placing additional courses of units until the desired height is
reached.
Special considerations

►
Sharp curves and half units will require cutting with a masonry cut-off
saw,* which can be rented at most equipment stores.
Unit dimensions: 4" high x 12" wide x 8" deep
*Follow instructions on proper usage
of equipment, and always wear your safety glasses and shoes. |